I bought this bike new in 1990 rode it a lot during my college & early working days and replaced everything on it over a period of five years or so. The parts I replaced were always high quality but not always the most ‘boutique’ makes   
 
Then along came cars / houses etc and the bike got pushed to the back of the shed 
 
I had been saying for ages that I would do up it up but after my brother recently bought himself a new rock hopper now’s the time …
I figured that it wouldn’t cost a lot to do and the money spent would only buy me a very low end new MTB – and a new one wouldn’t have any memories (three piece collarbone etc ). Everything will be as I had it BITD with the exception of :
 ). Everything will be as I had it BITD with the exception of :
Tyres – I always had hard packs or smokes but as I will use it mostly on road it will be run on slicks.
Seat post – The old TCO one had started to be eaten by the front edge of the seat tube due to flex / vibration
Flexstem / bars – I had cut them down and they are now to narrow for full length grips and bar ends. A Ti flexstem came up on eBay so that will replace them.
Bar ends – Were Onza but were quite badly scratched. As I will be having stuff re-anodized I would have had them done to but as they are bonded construction I was worried about the chemicals attacking the bond and then 14 stone finishing them off … 
   
 
Crank – Was DX with Ritchey (large) and pace rings but the tapers are shot so I found a NOS Ritchey compact.
I will do a spec sheet etc in due course but in the meantime here a few pics of the bits I have been doing :
Forks : Before and after ‘De Lugging’ :
		
		
	
	
		
 
	
		
 
	
Frame : Before and after ‘De Lugging’ :
		
 
	
		
 
	
		
 
	
		
 
	
Replacement bar ends (X-Lite Stubbie pro) – after refurb / before re-anodizing :
		
 
	
Crank bolt covers (bought off here) - after refurb / before re-anodizing :
		
 
	
Don’t expect a quick rebuild – I have to many other things going on to take up my spare time and money !
  – I have to many other things going on to take up my spare time and money !
Cheers,
WD
Edited to change the title to finished !!!
Edited to change the tile as the fourm page numbering has changed - page 26 is now page 38 !!!
				
			 
 Then along came cars / houses etc and the bike got pushed to the back of the shed
 
 I had been saying for ages that I would do up it up but after my brother recently bought himself a new rock hopper now’s the time …
I figured that it wouldn’t cost a lot to do and the money spent would only buy me a very low end new MTB – and a new one wouldn’t have any memories (three piece collarbone etc
 ). Everything will be as I had it BITD with the exception of :
 ). Everything will be as I had it BITD with the exception of :Tyres – I always had hard packs or smokes but as I will use it mostly on road it will be run on slicks.
Seat post – The old TCO one had started to be eaten by the front edge of the seat tube due to flex / vibration
Flexstem / bars – I had cut them down and they are now to narrow for full length grips and bar ends. A Ti flexstem came up on eBay so that will replace them.
Bar ends – Were Onza but were quite badly scratched. As I will be having stuff re-anodized I would have had them done to but as they are bonded construction I was worried about the chemicals attacking the bond and then 14 stone finishing them off …
 
   
 Crank – Was DX with Ritchey (large) and pace rings but the tapers are shot so I found a NOS Ritchey compact.
I will do a spec sheet etc in due course but in the meantime here a few pics of the bits I have been doing :
Forks : Before and after ‘De Lugging’ :
 
	 
	Frame : Before and after ‘De Lugging’ :
 
	 
	 
	 
	Replacement bar ends (X-Lite Stubbie pro) – after refurb / before re-anodizing :
 
	Crank bolt covers (bought off here) - after refurb / before re-anodizing :
 
	Don’t expect a quick rebuild
 – I have to many other things going on to take up my spare time and money !
  – I have to many other things going on to take up my spare time and money !Cheers,
WD

Edited to change the title to finished !!!
Edited to change the tile as the fourm page numbering has changed - page 26 is now page 38 !!!
 
 
		 
 
		 
 
		 
 
		 
  
  
 
		 
	 
	 
	 
	 
	 
	 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		