So chaps, today is a momentous day for the bike as we know it has gone to the bike shop for some jiggery pokerey and hopefully in a month (likely more) it will be ready.
Work to be done:
- The proper fork will go in using headset reducers which came from the US
- a black 1” King No Threadset is destined for the build
- the BB hole for the cable guide will be sorted and guide installed
- the loose cable stops in the frame are to be sorted of which there are at least 3
- the brakes will be sorted
- the gearing will be done
- new chain
- remove old post and insert replacement
Etc etc …
The end is near and I am very excited
As ever, more updates to come.